Havelock Marina, Marlborough
Harrison Grierson Consultants Ltd
Fulton Hogan
This project involved a 0.4Ha industrial development at Havelock Marina including construction of new boat hauling and washdown area.
A custom treatment train (VortCapture + 2-stage StormFilter) was developed by our inhouse Design team to meet the specific site contaminates.
The VortCapture is is designed as a pre-treatment device to treat Gross Pollutants and large particles.
The 2 Stage StormFilter consists of Perlite Cartridges (1st Stage) to remove fine sediment & hydrocarbons and Zeolite Cartridges (2nd Stage) to remove dissolved heavy metals.