SH16 St Lukes Interchange

Infrastructure
Site

SH16 St Lukes Interchange

Specifier

Aurecon

Contractor

Leighton Contractors

Description

A two kilometre section of the SH1 North-Western motorway will be widened from three to four lanes in each direction

7ea StormFilters have been specified for removal of total suspended solids (TSS) and heavy metals for a combined 4Ha catchment. Due to space restrictions on site, Offline bypasses have been internally incorporated (via Peak Diversion StormFilters) saving the client valuable program time and cost compared to building traditional external diversion structures.

20150202 140059
20150128 135654