Ritchies Bus Depot

Industrial
Site

Henry Rose Pl, Albany, Auckland

Specifier

Day Consultants

Contractor

Peter T Davies

Description

This project involved the development of a new bus servicing depot including 2200m2 new impervious hardstand.

Our in-house design team worked closely with the consulting engineers during the detailed design stage to provide appropriate devices to meet the specific site constraints and target contaminates.

A Stormwater360 API Oil/water separator was installed to remove hydrocarbons from the bus wash down area.

2ea StormFilters (with 5 cartridges and forebays) were installed to treat Total Suspended Solids (TSS) and heavy metals.