- SITE
- Tauranga Harbour Link, Tauranga New Zealand
- ENGINEERS
- Tonkin + Taylor
- CONTRACTORS
- Fletcher Construction
The requirement to treat around 5.5 hectares of surface area, of the new Tauranga Harbour bridge and its approaches provided a substantial challenge. The Tauranga City Council consent required that the treatment system removed at least 75% of the Total Suspended Solid (TSS) loading as well as removal of dissolved heavy metals such as Zic, Copper, Arsenic and Lead.
Stormwater360's solution using their StormFilter media filled cartridge filter was determined to be the best option for the site. Five separate vaults with a total of 93 filter cartridges were used to treat the various catchments. ZPG filter media